Lift Refurbishment In Nuneaton

Lift Refurbishment In Nuneaton

What We Did To Help

Control Panel Replaced

We replaced the control panel to a more modern and efficient lift control system with LIMAX levelling and great diagnostics for our engineers on site. The lift will now run in a much more reliable manner. All components we replace are open protocol and sourced in the UK. Our engineers are very used to installing DMG control systems now making the install process seamless.

Hydraulic Systems Upgraded

Door Operation

We replaced the lift door operator to an L&L system which is specially designed for the doors on site. we also replaced the door safety edges, did a car door overhaul, car lighting, shaft lighting, car top controls, auto-dialler with alarm, GSM and sim. This gives our client the complete package for their lift on site.

Benefits Of Getting Your Lift Refurbished

  • Delivery in 4 weeks.
  • Installation within 2 weeks.
  • Lift becomes more efficient, reliable, and safer.
  • Literally no building disruption, so clients can continue with their duties.
  • Much more cost effective than a replacement lift.

Related Articles

Lift Upgrade for Hassel Bridge

We recently finished a lift upgrade at a student accommodation building called Hassel Bridge in Staffordshire. The 4 stop 8-person...

care home lift

In the grand scheme of things, the lift as we know it is still fairly new. It was only in...

Nationwide Teddies

We have been rolling out our Nationwide brand teddies to new and existing clients. Care homes around the nation have...